Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
Permit Number - T05CM04203
Inspection Description - FRAMING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2006 | FRAMING | Approved | IVRS - Inspection :* 1) INSTALL ATTIC ACCESS 2) ITEM 03050 NOT APPLICABLE PER PAPERWORK TURNED IN BY INSPECTOR W. NORTH |
|
02/06/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO PROGRESS FROM PREVIOUS INSPECTION 2) NO APPROVAL TO INSULATE 3) REFEE WILL APPLY 4) YOU HAVE 5 DAYS TO PAY |
|
02/02/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO VISIBLE PROGRESS FROM PREVIOUS INSPECTION 2) REFEE WILL APPLY-YOU HAVE 5 DAYS TO PAY |
|
01/30/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. HD @ GARAGE/BED SHEER 2. SECURE WIRES WITHIN 8" OF BOX IN GARAGE 3. FRESH AIR INTAKE RIGID DUCT OUT OF WALL CAVITY 4. FIRESTOP ARCH @ ENTRY 5. NO DWV 6. STOPPED INSPECTION |
|
01/24/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) STUCCO LATH NOT COMPLETE 2) SEAL LATH PENETRATIONS 3) HOLDOWN |
|
01/20/2006 | FRAMING | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1) HCS COVERED WITHOUT INSPECTIONS-UNCOVER FROM HCS TO CLEANOUT 2) HOLDOWN ANCHOR BOLTS MISSING 3) SEAL ALL PENETRATIONS OF VAPOR BARRIER 4) A/C COPPER OUT OF WALL CAVITY 5) NO DWV WATER TEST 6) STOPPED INSPECTION 7) HOUSE NOT COMPLETE ENOUGH TO INSPECT |