Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 08/17/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) MINIUM 10 PSI TEST TO BE ON ENTIRE SYSTEM WITH NO LOSS OF PRESSURE FOR 15 MINUTES 2) PROVIDE 3 GALV SCREWS AT EACH JOINT OF WATER HEATER FLUE VENT INCLUDING CAP ON ROOF 3) PROVIDE BONDING OF BLDG GAS PIPING #4 WIRE 4) PROVIDE AGA OR CSA APPROVED GAS VALVE AND FLE RATED FOR 65,000 BTU'S |