Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2005 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :$ | |
| 08/25/2005 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SOLAR PANELS TO BE GROUNDED USING A #10 WIRE 2) ALL EMT CONDUITS AND NON-METALLIC SEALTIGHT LINES TO BE PROPERLY STRAPPED AND SUPPORTED OFF ROOF 3) J-BOX ON ROOF NOT PROPERLY SUPPORTED AND LOCK NUT LOOSE ON 1" CONDUIT, 1" CONDUIT TO BE STRAPPED BELOW ROOF 4) DRAINING SHOWS #6 BARE BOND FROM INVERTER TO EXISTING GROUND SYSTEM AT SERVICE 5) CALL FOR BUILDING FINAL ON PANEL MOUNTS (RAY) |
|
| 08/24/2005 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |