Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 10/07/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*SOIL WATER TEST IS OK FOR U.G. WASTE LINES FOR RM# 110,111,109,108,106,107,105,104 ONLY P.O.C OF NEW BLDG DRAIN IN RM# 104 TO EXISTING BLDG DRAIN IS OK NOTE: SHALL SEE ALL DELETED FIXTURES TO BE PERM CAP PRIOR TO CONCRETE PATCH OK TO BACKFILL TRENCH. |
|
| 10/05/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*SYSTEM HAS LOST ITS WATER TEST. CANNOT LOCATE A FERNCO COUPLING WITHIN THE STRUCTURE @ P.O.C OF NEW 4" BLDG DRAIN TO EXSISTING 4" BLDG DRAIN. DO NOT COVER |