Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* 1. CHANGE WATER HEATER FUSES TO 25 OR 30 AMP. |
|
| 06/12/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. REMOVE BONDING JUMPER ALL THE WAY IN PANEL. 2. BOND EQUIPMENT GROUNDS TO ENCLOSURE IN PANEL 3. WATER HEATER BRANCH CKT TO BE MINIMUM 30 AMP 4. PROVIDE ROOF ACCESS 5. WILL HAVE REINSPECTION FEE IF NOT CORRECT NEXT TRIP. |
|
| 06/09/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. BRANCH CKT TO WATER HEATER IS UNDERSIZED NEC 422.10 (A) 2. EMERGENCY LIGHTING NOT WORKING. 3. MINIMUM SIZE EQUIPMENT GROUND FOR 30 AMP RTU'S IS #10 NEC 250.122 4. GROUND AND NEUTRALS MUST BE SEPARATED IN SUB-PANEL NEC 250.122 5. INSTALL EXTERIOR LIGHTS ON W.P COVERS 6. GROUND PANEL ENCLOSURE |