Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T05CM03937
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/19/2007 | ENGINEERING - FINAL | Approved | Contractor completed punch list. Hold Grading permit until fuel station is completed. | |
12/13/2006 | ENGINEERING - FINAL | Partial Approval | OKAY FOR C OF O PER INSPECTION COPY COMPLETE ITEMS 5,6,10, AND 14 |
|
12/01/2006 | ENGINEERING - FINAL | Denied | Contractor needs to complete for Temp C of O: 1- Complete all HC items. (ramps, trucated domes) 2- Complete all public access items or fence off. 3- Seperate all construction activity from public access. 4- Seperate all construction debris from public access. 5- Remove form pins from rear drainage channel. 6- Address ponding issue west side of building. (around existing building) 7- Complete all work along Norris or fence off. 8- Submit phased grading plan. Seperate gas station from store. 9- Clean all wash out from around building. For final C of O and Grading also complete: 1- Stabilize all areas disturbed by construction. 2- Complete all basin work. 3- Clean parking area. (all) 4- Clean Norris. 5- Complete all construction around outside of building. 6- Remove all construction debris. 7- Remove all BMP's. 8- Remove all port-a-pottys. 9- Fence off all work for gas station. No equipment or materials outside of fencing. 10- Remove wood forms from scuppers. 11- Complete all striping. 12- Stabilize alley south of 220 Norris. (cold patch) 13- Install gates on trash enclosure. 14- Submit all red lines to review engineer. This is not a final punch list, other items may need to be addressed. |