Permit: T05CM03937

Parcel: 12901044C


Addresses:

1940 E BROADWAY BL


Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T05CM03937

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
01/16/2007 EXCAVATION/LAYOUT REBAR & ZON Approved
09/20/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
3'-0" HIGH CMU SCREEN WALL, FOOTINGS
DETAILS: 65' WEST OF NWC OF BUILDING
45' WEST OF NWC OF BUILDING
60' NORTH OF NWC OF BUILDING
GSN, SO.2, A0.1
09/19/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 24" LIGHT POLE BASES
SIGN ON E0.2
09/18/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
PARTIAL @ TRUCK WELL CURB B.0/6-8, A-6-8.0 S1.1A
09/15/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
24" NO LIGHT POLE BASES
10'E/65'N OF NWC OF BLD. AND DETAILS 27/S0.2
10'E/145'N OF NWC OF BLD AND DETAILS 27/S0.2
85'E/70'N OF NWC OF BLD AND DETAILS 27/S0.2
85'E/165'N OF NWC OF BLD AND DETAILS 27/S0.2
85'E/250' N OF NWC OF BLD AND DETAILS 27/S0.2
85'E/335'N OF NWC OF BLD AND DETAILS 27/S0.2
09/14/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. RAMP FOOTINGS GRIDLINE 5' E OF 1/C.4-D.0
5'-5 OF A/3.0-6.0
DETAILS GNS S1.1A, S1.2

2. GRIDLINE A/2.0-3.0 @ TOPOUT
A/6.0-8.0 @ TOPOUT
DETAILS GSN, S0.2, S1.1A, S1.2, S3.1
09/07/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
09/06/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONC. LINTEL BRG @ MASONRY L-5
ACCORDING WITH DETAIL 11/SHEET S3.2
#5 VERT/HORIZ 12" O.C
2 - #6 BOTTOM/ 3/8" 0 AB 24" OC
2 - #5 TOP
07/26/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
LINES A/1 - A/1.6; A/1.1 - A/.5
*UFER APPEARS TO BE CORRECT IN LOCATION AND INSTALLATION
07/25/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
07/17/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
DOCK SCREENWALL GRID A
07/06/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
GRIDLINE @ A THRU B
DOCK WALL S1.2 10/11
8" C.I.P CONC. WALL W/#5 V @ 16" O.C 4'6" ELEV.
#5H @ 12" O.C 4'6" ELEV.
07/05/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
06/30/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NOTE: F LINE (GRIDLINE) 9.1 THRU 10
COLUMN ELEVATOR RAIL SUPPORT COL.
06/29/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NOTE: INT. FOOTINGS (3) - 7'0"X7'0"X18" THK 18/5 SHEET S1.1A
SP. REP. BY WESTERN TECH. INC. 6/29/06
REBAR 6- #7 EACH WAY
DETAIL S1.2-8
06/28/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
PARTIAL @ WEST LINE (10) B THRU F on sheet S.1.1A
5 COLUMNS FOOTING 5'6"X5'6"X14" THK
06/27/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) PARTIAL B LINE 1 THRU 10
06/22/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
GRIDLINE 9.1 LINE F - LINE 1-F