Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05CM03931

Parcel: 124170940


Addresses:

1125 S PARK AV

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
07/12/2006 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
APPROVED PER APPROVED PLANS
07/10/2006 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. PROVIDE TEST ON ALL PIPING.
2. PROVIDE APPROVED COUPLING AT VENT CONNECTION TO EXISTING.
3. NOTE: PUBLIC USE LAVS REQUIRES THAT WATER HEATER NOT BE SOLE CONTROL OF HOT WATER TEMPERATURE NOT TO EXCEED 110 DEGREES. TEMPERING SHALL BE REQUIRED.
4. INSTALL WATER PIPING PER PLAN FROM METER THRU NEW RPA TO BUILDING.
5. PROVIDE VACUUM BREAKERS AT ALL HOSE BIBBS.
6. WATER HEATER SHALL REQUIRE PAN & PAN DRAIN
T&P AND PAN DRAIN SHALL GRAVITY DRAIN TO DAYLIGHT.