Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2006 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
| 08/03/2006 | ENGINEERING - FINAL | Correction Required | The business at 2252 E. Benson Highway flooded due to the sidewalk blocking existing flow. Contacted Chuck with Caylor Construction in regards to issue. | |
| 06/09/2006 | ENGINEERING - FINAL | Denied | Contractor needs to complete items: 4- Have all changes to drawing approved at 201 N. Stone. 6- Grade basin per approved plan. 7- Install outlet wier. 9- Provide letter from engineer in regards to drainage. 10- Complete grading to basin inlet northeast side of basin. 16- Have engineer address flow across north side of project. 17- Close out grading permit. Noted on inspection from 5/9/06. |
|
| 05/09/2006 | ENGINEERING - FINAL | Denied | Contractor needs to address: 1- Complete trash enclosure. 2- Stabilize all areas distrubed by construction. 3- Complete all fence work. 4- Have all changes to drawing approved at 201 N. Stone. 5- Down spout blocked southeast corner of building. 6- Grade basin per approved plan. 7- Install outlet wier. 8- 2 to 1 side slopes req. rock rip rap on filter fabric. 9- Provide letter from engineer in regards to drainage. 10- Complete grading to basin inlet northeast side of basin. 11- Have 6" pvc pipe on northeast corner of basin approved. 12- Grout rock on all slopes 1 to 1. 13- Backfill all open holes. 14- Backfill back of sidewalk east side of project. 15- Clean up concrete wash out. 16- Have engineer address flow across north side of project. 17- Close out grading permit. |