Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2006 | ENGINEERING - FINAL | Approved | ||
| 02/02/2006 | ENGINEERING - FINAL | Not ready for Inspection | NO CHANGE SINCE 1/27 SITE NOT READY RE-FEE IF ANOTHER NOT READY INSPECTION RESULT |
|
| 01/31/2006 | ENGINEERING - FINAL | Not ready for Inspection | SITE STILL NOT READY WHEELBARROW AND OTHER CONSTRUCTION MATERIALS IN PATIO AREA. AREA MUST BE SWEPT AND READY FOR DOORS TO OPEN. RECALL VIA IVR 1 DAY B4 OPENING |
|
| 01/30/2006 | ENGINEERING - FINAL | Not ready for Inspection | SITE STILL NOT READY WHEELBARROW IN PATIO AREA PAINT BUCKET IN PATIO AREA STILL NEEDS TO BE SWEPT 3 SANITARY SEWER MANHOLE COVERS STAMPED WITH THE TOWN OF SAHURITA LOGO?? |
|
| 01/27/2006 | ENGINEERING - FINAL | Not ready for Inspection | TEMP C OF O ONLY AVAILABLE UNTIL SHELL COPMPLETED AND FINALED SITE NOT READY-WILL RE INSPECT 1/30 |