Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* CLOSET FLANGES SET ABOVE CONCRETE TO ANTICIPATED TELE HEIGHT |
|
| 12/21/2005 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* AM PIPING IN WALLS OK RUN TEST ON PIPING ACCEPTED CALL FOR CLOSET FLANGE INSPECTION WHEN READY |
|
| 12/16/2005 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*RM 149 HAS LEAKS ON 3" FROM RM ABOVE ALSO CORRECT LEAK FROM WC ABOVE TEST FOR LEAKAGE BEFORE CALLING INSPECTION CALLF OR CLOSET FLANGE INSPECTION( INTERMEDIATE 3035) LEAKING RM 104 HAS BEEN CORRECTED SHWR HEAD ADAPTORS HAVE BEEN SECURED |
|
| 12/14/2005 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) ROOM 149: TOILET WASTE FROM UNIT ABOVE HAS BACK PITCH IN CEILING SECURE DROP ? AT SEWER 2) ROOM 155: SECURE DROP ? ? WASTE AND OVER OK, WET BAR OK AND BELOW FLOOR OK 3) ROOM 104: LEAK ON WASTE FROM UPPER FLOOR IN WALL-OK TO COVER PIPING IN FLOOR 4) ROOM 112: OK TO COVER WET BAR, SHOWER OK, LEAK IN ON STAIRS WASTE-RETEST 5) ROOM 165: OK TO COVER PIPING-SECURE SEWER HEAD-FOAM WEEP |
|
| 12/08/2005 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ROOM 112 4" DRAIN LINE FROM UPPER FLOORS OFF SET HAS BACK PITCH 2) ROOM 104 BACK PITCH PRESENT ON CLOSET WASTE 3) ROOM 149 BACK PITCH PRESENT ON CLOSET WASTE 4) SUPPORT ABS AT ALL 90 DEGREE CHANGES OF DIRECTION 5) PLUMBERS TAPE IS NOT AN APPROVED PIPE SUPPORT 6) RUN TEST WILL INCLUDE 1ST FLOOR TUB WASTE AND OVERFLOW. PLEASE HAVE TUB FULL OF WATER PRIOR TO INSPECTION |
|
| 12/05/2005 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* ADA UPGRADES TO RMS 104,112,149,155,165 RM 104 BACKPITCH ON TUB DRAIN 112 WET VENTING LIMITED TO VERTICALL PIPING COORDINATE RUN TEST FOR ALL PIPING FILL TUBS & RUN TEST. SUPPORT HORIZONTAL PIPING AT CHANGES OF DIRECTION. SWEEPS REQUIRED FOR HORIZONTAL CHANGE OF DIRECTION INSTALL PROPER DRAINAGE FITTINGS FOR VENTS INSTALL SAFETY PLATES WHERE NEEDED TO PROTECT PIPING |