Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05CM03858

Parcel: 140420280


Addresses:

7051 S TUCSON BL

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
01/13/2006 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
CLOSET FLANGES SET ABOVE CONCRETE TO ANTICIPATED TELE HEIGHT
12/21/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
AM PIPING IN WALLS OK RUN TEST ON PIPING ACCEPTED CALL FOR CLOSET FLANGE INSPECTION WHEN READY
12/16/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*RM 149 HAS LEAKS ON 3" FROM RM ABOVE
ALSO CORRECT LEAK FROM WC ABOVE
TEST FOR LEAKAGE BEFORE CALLING INSPECTION
CALLF OR CLOSET FLANGE INSPECTION( INTERMEDIATE 3035)
LEAKING RM 104 HAS BEEN CORRECTED
SHWR HEAD ADAPTORS HAVE BEEN SECURED
12/14/2005 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) ROOM 149: TOILET WASTE FROM UNIT ABOVE HAS BACK PITCH IN CEILING SECURE DROP ? AT SEWER
2) ROOM 155: SECURE DROP ? ? WASTE AND OVER OK, WET BAR OK AND BELOW FLOOR OK
3) ROOM 104: LEAK ON WASTE FROM UPPER FLOOR IN WALL-OK TO COVER PIPING IN FLOOR
4) ROOM 112: OK TO COVER WET BAR, SHOWER OK, LEAK IN ON STAIRS WASTE-RETEST
5) ROOM 165: OK TO COVER PIPING-SECURE SEWER HEAD-FOAM WEEP
12/08/2005 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) ROOM 112 4" DRAIN LINE FROM UPPER FLOORS OFF SET HAS BACK PITCH
2) ROOM 104 BACK PITCH PRESENT ON CLOSET WASTE
3) ROOM 149 BACK PITCH PRESENT ON CLOSET WASTE
4) SUPPORT ABS AT ALL 90 DEGREE CHANGES OF DIRECTION
5) PLUMBERS TAPE IS NOT AN APPROVED PIPE SUPPORT
6) RUN TEST WILL INCLUDE 1ST FLOOR TUB WASTE AND OVERFLOW. PLEASE HAVE TUB FULL OF WATER PRIOR TO INSPECTION
12/05/2005 PLUMBING - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999* ADA UPGRADES TO RMS 104,112,149,155,165
RM 104 BACKPITCH ON TUB DRAIN
112 WET VENTING LIMITED TO VERTICALL PIPING
COORDINATE RUN TEST FOR ALL PIPING
FILL TUBS & RUN TEST.
SUPPORT HORIZONTAL PIPING AT CHANGES OF DIRECTION.
SWEEPS REQUIRED FOR HORIZONTAL CHANGE OF DIRECTION INSTALL PROPER DRAINAGE FITTINGS FOR VENTS
INSTALL SAFETY PLATES WHERE NEEDED TO PROTECT PIPING