Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2006 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 04/11/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* GAS SYSTEM PRESSURE IS HOLDING STEADY. WAITING ON PLAN REVISION FOR FINAL INSPECTION. |
|
| 04/07/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 5 1/2 PSI ON GAS PIPING SYSTEM PLAN SHOWS 2" GAS PIPING WITH BRANCH LINES TO HEATERS. A 3" GAS LINE WITH A 2 1/2" BRANCH THAT IS CAPPED IN CEILING, HAS BEEN INSTALLED. THE PIPING AND THE PLAN MUST LOOK ALIKE. SEE NOTES FROM PREVIOUS INSPECTION. |
|
| 03/17/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 5 PSI ON 3" GAS LINE THERE IS A LARGE VOLUME OF AIR IN A 8" GAS LINE THIS WILL REQUIRE A 24 HR. TEST. PLEASE AIR UP GAS LINE THE DAY BEFORE TEST. 94 UPC REQUIRES 10 PSI PIPING NOT INSTALLED PER PLAN. REVISE PLAN. 3/4" GAS LINE IN WALL OK TO COVER IF PLAN IS REVISED AND PRESSURE IS HOLDING. |