Inspection Status: Approved

Inspection History: FRAMING

Date Description Inspector Results Comments
05/16/2006 FRAMING Approved IVRS - Inspection :*
05/12/2006 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) OPEN DRYWALL IN HALL AND BEDROOM TO SEE BEAM CONNECTIONS ON SECOND FLOOR
03/29/2006 FRAMING Partial Approval IVRS - Inspection :*
1) BEARING PROBLEM AT 2ND FLOOR TRANSFER TO FLOOR SHEATHING
02/27/2006 FRAMING Partial Approval IVRS - Inspection :*
1) PLAN NOT SHOWING SUPPORT AT ONE SIDE OF HEADER 2ND FLOOR, ADD MISSING GLU LAM ON EAST SIDE OF POINT LOAD PER PLAN
02/21/2006 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) FILL TUBS WITH H20
2) NEED POTABLE H20 TEST
3) USING DETAIL 5, 6 AND 7 NAIL ? JOIST, FLOOR TRUSS PER DETAIL
4) LOOSE ROMEX AT LIVING ROOM CEILING, 2ND FLOOR BATH AND TOP OF STAIR CAN LIGHT
5) MOVE PEX 12" AWAY FROM LIGHT CANS
6) BLOCK AT TOP OF STAIR AND FLOOR SHEATHING
02/17/2006 FRAMING Not ready for Inspection IVRS - Inspection :*
01/26/2006 FRAMING Not ready for Inspection IVRS - Inspection :*
1) NOT READY PER SUPER