Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2006 | ENGINEERING - FINAL | Approved | ||
| 04/27/2006 | ENGINEERING - FINAL | Denied | 1) CLEAN UP EXCESS ASPHALT AND CONSTRUCTION DEBRI/ MATERIALS. 2) COMPLETE SCREEN WALL 3) COMPLETE LANDSCAPING 4) INSTALL GATES ON TRASH ENCLOSURE PER APPROVED PLAN 5) INSTALL 3' LONG CURB DEPRESSION W/10'X3' RIP RAP PER PLAN, OR / ADDRESS DRAINAGE ON WEST SIDE OF BLDG ALONG WALL TO NORTH. PROVIDE SWALE TO ALLOW STORM WATER TO MAKE IT TO EXISTING CURB OPENING AND INSTALL ROCK ALONG SIDE. 6) INSTALL DOWN SPOUTS ON N. SIDE OF BLDG. |