Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T05CM03766
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2007 | ENGINEERING - FINAL | Approved | ALL ISSUES HAVE BEEN ADDRESSED | |
| 02/13/2007 | ENGINEERING - FINAL | Partial Approval | TEMP C OF O APPRVD 12/30/05 BY DROBERTS NO PERM C OF O UNTIL WHOLE SITE IS COMPLETE BRKN CURB AT SW CORNER OF BUILDING STRIPING IN LOADING ZONE NOT COMPLETE DRAINAGE AT SE SIDE OF BUILDING IS BEING CHANGED |
|
| 01/12/2006 | ENGINEERING - FINAL | Partial Approval | TEMP C OF O APPRVD 12/30/05 BY DROBERTS NO PERM C OF O UNTIL WHOLE SITE IS COMPLETE BRKN CURB AT SW CORNER OF BUILDING STRIPING IN LOADING ZONE NOT COMPLETE DRAINAGE AT SE SIDE OF BUILDING IS BEING CHANGED |
|
| 01/04/2006 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPRAOVED AT THSI TIME FINAL NOT TO BE GIVEN UNTIL ALL ADJACENT WORK FOR THIS SITE IS COMPLETE. |