Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2006 | PLUMBING - FINAL | Approved | ||
| 09/06/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/05/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* ALL FIXTURES TO BE FUNCTIONAL EXTERIOR VENT THRU ROOF TO BE PAINTED IN EXPOSED LOCATION ON ROOF. |
|
| 08/15/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL USE LONG RADIUS FITTING FOR STUDDOR VENT BRANCH BELOW FLOOD RIM OF FIXTURE. 2. MAKE WATER TIGHT ALL FIXTURES. 3. INSTALL SHOWER DRAIN STRAINER & LAUNDRY BOX ESCUTION & REFRIGERATOR BOX ESCUTION. 4. PROVIDE 2-HOLE CLAMP FOR HIGH LOOP OF DISHWASHER DRAIN HOSE & CLAMPS FOR DISPOSAL CONNECTION. 5. PROVIDE PERMANENT LABEL FOR NON-BONDED PLASTIC WATER PIPING. 6. PROVIDE 90 DEG. DOWN TERMINATION OF WATER HEATER T&P 7. PROVIDE LOCKHOLE COVERS AT SINK EXTRA HOLE. 8. PROVIDE TAPPED CLEANOUT PLUGS -- CLEANOUT COVERS & MACHINE SCREWS. |
|
| 08/09/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* THIS INSPECTION FOR FINAL CONNECTION OF YARD WATER OK |
|
| 08/08/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* THIS INSPECTION FOR YARDWATER TIE-INS SHALL PROVIDE CORRECT TRANSITION FROM PLASTIC TO COPPER. SHALL HAVE PIPING ON FIRM BEDDING. |