Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* WATER TEST THRU ROOF WASTE & VENT OK WATER PIPING OK |
|
| 02/17/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTES ABOVE & COMPLY ALL VENT PIPING BELOW FLOOD RIM OF FIXTURE TO BE LONG RADIUS DRAINAGE FITTINGS, ALL DRAINAGE PIPING TO BE LONG RADIUS DRAINAGE FITTINGS. |
|
| 02/14/2006 | PLUMBING - INTERMEDIATE | Cancelled | CANCELLED PER CONTRACTOR ERIC #808-9906 | |
| 02/14/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 02/09/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE TEST ON PAN DRAIN FOR UPSTAIRS WASHING MACHINE PROVIDE BACKING & SUPPORT TUB & SHOWER DRAINS. 1. PROVIDE 3" UPPER TERMINAL CLEANOUTS AS REQUIRED PER 94 UPC -- SUPPORT HORIZONTAL DRAINAGE & UNIT AT 4' INTERIORS FOR PLASTIC PIPING. 2. PROVIDE SEPARATION OF HOT & COLD TUBING FOR WATER AND SUPPORT 3. PROVIDE CORRECT TRANSITION FOR PVC TO ABS PIPING OR PROVIDE PVC WASTE & OVERFLOW KITS FOR TUBS. GREEN GLUE NOT IN CORRECT TRANSITION. 4. EXPOSE ALL WASTE & VENT PIPING FOR INSPECTION 5. VENT KITCHEN PER PLAN WITH WATER TEST |