Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2005 | EXT METAL CLIPS/EXT SHEATHING | Approved | ||
| 10/26/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) #7 SHEARWALL REQUIRES A-35 CLIPS AT 8" ON CENTER REAR WALL 2) 6/DT1 BRACES MUST BE INSTALLED AT 4' ON CENTER 3) 5/8" ANCHOR BOLTS REQUIRE WASHERS AND TIGHTEN NUTS 4) 3/8" OSB SHEAR PANELS MUST BE INSTALLED WITH LONG DIMENSION ACCROSS STUDS PER IRC TABLE 602.3 (3) NOTE 6 5) 14/DT1 PANELS NOT NAILED THRU ROOF |
|
| 10/21/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) RENAIL SHEAR TRANSFER PANELS, OVER GARAGE/BED WALL, THROUGH THE ROOF SHINERS 2) NAIL OUTRIGGERS ESPECIALLY WHERE ROOF SHEATHING ONLY COVERS 1 TRUSS BAY 3) STRAP ENTRY TRUSS DOWN TO COLUMN 4) NAIL OFF WALL INTERSECTION STRAP AT PATIO, STRAP GLUE LAM AND ADJACENT WINDOW HEADER 5) NEED ANCHOR BOLTS IN PATIO AND ENTRY COLUMNS 6) STRAP REAR GABLE TRUSS DOWN TO PATIO COLUMN 7) NEED RSP4 AND NAILING AT TOP OF OSB AT REAR LEFT CORNER |