Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 12/06/2005 | FRAMING | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1) SECURE STAIR PONY WALL 2) RED HEAD ANCHOR BOLTS LOOSE 3) A/C COPPER OUT OF WALL 4) BLOCK DUCT BOOTS 3 SIDES POWDER ROOM 5) DWV HORIZONTAL RUN REQUIRES 1/4"/FT PITCH 6) GAS LEAK LOST 1/2 POUND IN 10 MINUTES 7) STOPPED INSPECTION-NEXT FAILURE WILL REFEE |
|
| 12/05/2005 | FRAMING | Cancelled | CANCELLED PER TIM OF K.B. HOMES #907-6040 | |
| 11/28/2005 | FRAMING | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1) NO DWV WATER TEST 2) NO GAS PRESSURE TEST 3) RED HEAD ANCHOR BOLTS LOOSE 4) STAIR RISERS CANNOT EXCEED 7 3/4" PRESENTLY 8" 5) HOUSE NOT READY 6) STOPPED INSPECTION 7) SUPERINTENDENT TO INSURE WORK IS COMPLETE PER PLAN AND CODE PRIOR TO CALLING FOR INSPECTION |