Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 09/11/2006 | FRAMING | Denied | INCOMPLETE-SEE PREVIOUS PAPERWORK AND COMPLY | |
| 09/08/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) NOT READY PER CONTRACTOR |
|
| 08/30/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REPLACE FIRE BLOCK UPPER BATH AT PLMB FURR DOWN 2) FIRE STOP FLOOR/CEILING PENETRATIONS THROUGHOUT 3) INSTALL FIRE STOP SPACER FLUE AT UPPER FLOOR CEILING 4) FLUE PIPE JOINTS NOT CONNECTED 5) REPLACE-REPAIR CUT I-JOIST PER ENGINEER SPECS FURNACE ROOM 6) MAINTAIN MINIMUM RISE MECH FLUE FOR H20 HEATER 7) APPEAR LOWER FLOOR CEILING I-JOISTS 8) EXCESSIVELY BORED/CUT, SEE I-JOISTS SPECS AND COMPLY 9) STOPPED INSPECTION |