Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2006 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
| 05/09/2006 | ENGINEERING - FINAL | Denied | Contractor needs to address: 1- Complete trash enclosure. 2- Backfill all open trenches. 3- Remove construction debris. 4- Provide letter from engineer in regards to note 15. 5- Stripe per plan. 6- Clean up concrete wash out westside of west fence. 7- Back fill all open holes in parking lot. 8- Have engineer address wall that runs on north and west side of project. See note on grading plan. (elev. of 37.5 called out) 9- Install planter westside of parking lot. Per approved plans. 10- Complete all grading. 11- Install extruded curb southwest side of building. Per approved plans. 12- Have engineer address drainage. (water ponding in parking lot) 13- Stablilze all areas distrubed by construction. |