Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T05CM03307
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/11/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* MET FAMER CONST. ON SITE DISCUSSED ALL PLUMBING ISSUES. 1. SHALL BE INSTALLED PER APPROVED PLAN AND IN COMPLIANCE WITH 2003 UPC, PER NOTES LEFT ON PAST INSPECTIONS. CHANGES REQUIRE REDLINES ON SITE WITH APPROVED REVISED CITY PLANS AT LATER DATE |
|
| 05/24/2007 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO PLUMBER ON SITE, NO CHANGE, PAY REFEE READ ALL NOTES, INSTALL PER APPROVED PLAN TO MEET 2003 UPC REQUIREMENTS. |
|
| 04/24/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. INSTALL ALL DRAINAGE CONNECTIONS REQUIRED ON YOUR APPROVED PLAN WITH RETEST 2. SUPPORT ALL PIPING AT CORRECT INTERVALS WITH CORRECT MATERIALS. 3. SEE ALL NOTES ABOVE HAVE YOUR PLUMBING CONTRACTOR ON SITE FOR ADDITIONAL REQUIREMENTS NOT LISTED. 4. CHANGES TO APPROVED PLAN REQUIRE REVISED CITY APPROVED PLANS ON SITE. |
|
| 03/22/2007 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTES FROM 3/8/06 INSPECTION & COMPLY PROVIDE TESTING REQUIRED ON PIPING |
|
| 03/08/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE WATER TEST THRU ROOF ON WASTE & VENT PIPING 2. SUPPORT HORIZONTAL WASTE & VENT PIPING AT 4' INTERVALS. 3. PROVIDE LONG RADIUS DRAINAGE FITTINGS FOR HORIZONTAL DRAINAGE. 4. PROVIDE REVISED APPROVED PLAN FOR ANY FIXTURES ADDED AND PROVIDE CORRECT DRAINAGE FOR THEM. NOTE: EXTERIOR PLUMBING FIXTURE REQUIRE THAT NO RAIN WATER CAN ENTER THE SANITARY DRAINAGE SYSTEM. 5. INSTALL WATER PIPING FOR PLAN AND SUPPORT AT CORRECT INTERVALS PER 2003 UPC WITH APPROVED MEANS OF SUPPORT. |