Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T05CM03307
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* PLANS AND PERMIT WILL BE REQUIRED FOR INSTALLING WALK-IN COOLER |
|
| 11/19/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ALL 15 & 20a 120V KITCHEN RECEPTACLES TO BE GFI 2. ROOFTOP UNIT OVERFUSED 3. EM LIGHTING TO BE ON CIRCUIT IN AREA 4. BOND DUCT HEATER DISCONNECT 5. INSTALL PLASTIC BUSHINGS ON CONNECTORS WITH CONDUCTORS #4 OR LARGER |
|
| 09/17/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. COMPLETE ITEMS ALL ITEMS FROM PREVIOUS INSPECTION. ELECTRICAL CONTRACTOR TO BE ON SITE FOR INSPECTION 2. COLOR CODING OF WIRES IN PANEL TO BE BLACK, RED, BLUE - A, B, C ARE NEUTRALS BEING SHARED IMPROPERLY 3. DUCT HEATER NOT PER PLAN. CIRCUIT SUPPLYING HEATER AS INSTALLED NOT SIZED LARGE ENOUGH 4. ELECTRICAL CONTRACTOR GO THROUGH ENTIRE JOB INSTALL AS PER PLANS & NEC 5. HAVE APPROVED SET OF PLANS ON SITE |
|
| 08/29/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. COMPLETE ALL ITEMS FROM PREVIOUS INSPECTION ON 8/19/08. HAVE APPROVED PLANS ON SITE 2. BOXES MORE THAN 1/4" BACK NEED EXTENSIONS 3. MARK BREAKER NUMBERS. NEED DETAILED PANEL DIRECTORY. 4. INSTALL WALK IN COOLER 5. HAVE PANEL OPEN FOR INSPECTION 6. EM/EXIT LIGHTING NOT WIRED PER PLAN/NEC 7. INSTALL ALL MOUNTING HARDWARE FOR RECEPT IN INDUSTRIAL COVERS 8. NEED GFI RECEPT ON ROOF 9. SECURE DISCONNECTS ON ROOF 10. PROPERLY STRAP SECURE RACEWAYS ON ROOF 11. UNITS MISSING FUSES AND OVERFUSED 12. DISCONNECT NOT GROUNDED 13. EQUIPMENT GROUNDS NOT SIZED PROPERLY 14. ELECTRICAL CONTRACTOR GO THROUGH ENTIRE JOB INSTALL PER PLANS AND NEC. |
|
| 08/28/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* BUILDING LOCKED NO ONE ON SITE |
|
| 08/19/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. CONTR. NOT SURE ABOUT PAST INSP. HISTORY CALL INSPECTION 2. SEISMIC WIRES REQUIRED FOR EXITS AND EM LIGHTS 3. PANEL NOT WIRED PER PLAN 4. CANNOT VERIFY FUSE SIZES AT SES 5. 110V RECEPTS IN KITCHEN AREA TO BE GFI PROTECTED PER CODE ALSO SEE PLANS |
|
| 05/21/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. INSTALL LISTED MAST BRACING 2. INSTALL PROPER SIZE FUSES 3. INSTALL PROPER SIZE EQUIPMENT GROUNDING CONDUCTOR TO PANEL |
|
| 04/17/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. POST BOND FOR TEMP POWER 2. HAVE PANEL & SWITCH GEAR OPEN FOR INSPECTION 3. INSTALL LISTED MAST BRACING 4. INSTALL DISCONNECT FOR DUCT HEATER 5. RECALL FOR "2065 SERVICE UPGRADE" INSPECTION |