Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2007 | ENGINEERING - FINAL | Approved | STAMPED SITE PLAN BY LOREN 4/6/07 H/C PARKING SHOWN ON SITE PLAN MATCHES SITE TRUNCATED DOMES INSTALLED PER SITE PLAN NO TRUNCATED DOMES IN RIGHT OF WAY |
|
| 03/30/2007 | ENGINEERING - FINAL | Not ready for Inspection | Met Mark (440-4015) site super on site. I explained to Mark he needed to get an revised site plan, showing all changes. Any work completed before revised site plan is approved is at the contractors risk. Mark said he understood that and would not start any work until he and the engineer meet with Loren. | |
| 03/29/2007 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Have all changes on the site plan approved. 2- Complete all work on approved site plan. 3- Complete all water harvesting areas. 4- Stabilize all areas on south side of project. 5- Contractor needs to install trucated domes. 6- Complete all fence work. 7- Engineer needs to show all access to building. South side not shown. This is not a complete punch list. |