Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2005 | PLUMBING - FINAL | Approved | ||
| 09/27/2005 | PLUMBING - FINAL | Not ready for Inspection | PROVIDE CORRECT BACKFLOW PROTECTION WITH CORRECT INSTALLATION & SUPPORT & CERTIFICATION. PROVIDE CORRECT INSTALLATION OF PRESSURE REDUCER VALVE AT CARBONATOR. |
|
| 09/26/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*PROVIDE CORRECT BACKFLOW PROTECTION FOR EACH DIRECT CONNECTED WATER SUPPLY TO APPLIANCES THAT MIX OTHER MATERIAL WITH WATER. PROVIDE SEPARATION INDIRECT DRAINS FOR ALL ITEMS THAT REQUIRE DRAINAGE OVER 5' P TRAP. ALL INDIRECT DRAINS TO GRAVITY DRAIN. | |
| 09/22/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |