Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05CM03249

Parcel: 12801005H

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T05CM03249

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
09/28/2005 PLUMBING - FINAL Approved
09/27/2005 PLUMBING - FINAL Not ready for Inspection PROVIDE CORRECT BACKFLOW PROTECTION WITH CORRECT INSTALLATION & SUPPORT & CERTIFICATION.
PROVIDE CORRECT INSTALLATION OF PRESSURE REDUCER VALVE AT CARBONATOR.
09/26/2005 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*PROVIDE CORRECT BACKFLOW PROTECTION FOR EACH DIRECT CONNECTED WATER SUPPLY TO APPLIANCES THAT MIX OTHER MATERIAL WITH WATER. PROVIDE SEPARATION INDIRECT DRAINS FOR ALL ITEMS THAT REQUIRE DRAINAGE OVER 5' P TRAP. ALL INDIRECT DRAINS TO GRAVITY DRAIN.
09/22/2005 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*