Permit: T05CM03222

Parcel: 140383290

Inspection Status: Approved

Inspection History: FRAMING

Date Description Inspector Results Comments
12/09/2005 FRAMING Approved IVRS - Inspection :*
12/08/2005 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) DWV AND WATER OK
12/02/2005 FRAMING Denied IVRS - Inspection :
Work is not complete enough to inspect.| 950*
1) 16" OF COPPER REQUIRED TO PEX AT WATER HEATER
2) SEAL VAPER BARRIER PENETRATIONS
3) NAIL PROTECT WIRES
4) WHIM 5050 HEADER AT 16" ON CENTER 3030 ALSO AND 5040 (ALL)
5) NAIL SHEAR 2 X 12 AT 8" ON CENTER
6) ANCHOR BOLTS LOOSE
7) LAV DIRTY ARM MUST BE 1 1/2" AND 42" TO VENT
8) NO GAS TEST
9) COMPLETE LATH
10) STOPPED INSPECTION