Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2005 | FRAMING | Approved | IVRS - Inspection :* 1) RE-INSPECT |
|
| 10/12/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ITEM 03050 NOT APPLICABLE PER PAPERWORK TURNED IN BY INSPECTOR D. QUINN 2) SECONDARY CONDENSATE NOT CONNECTED 3) FIREPLACE FLUE NOT TERMINATED THROUGHOUT ROOF-SEAL ROOF SHEATHING 4) OK TO INSULATE |
|
| 10/10/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO GAS-ALL ELECTRIC 2) NO TEST ON DWV'S OR WATER LINES 3) PROVIDE 1" CLEARANCE FROM COMBUSTIBLES AT WATER HEATER FLUE 4) COMPLY WITH DETAIL 10/DT1 AND 2/DT1 5) FAU COPPER LINES NOT TERMINATED 6) SECONDARY CONDENSATE NOT CONNECTED 7) L" CLEANOUT MISSING AT MASTER TUB 8) FIREPLACE FLUE NOT TERMINATED THROUGHOUT ROOF 9) NAIL PROTECT WATER LINES AND ROMEX AT NORTH EAST CORNER 10) SHEER BLOKC PANEL CUT |