Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2008 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection :* 1) APPROVED PER REVISION FROM 6" TO 4" MAIN 4/5/07 |
|
| 08/10/2006 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection :* | |
| 06/22/2006 | PLUMBING - SEWER HCS CONNECT | Partial Approval | CHANGE OF SEWER PIPING SIZE FROM 6" TO 4" REQUIRES A STAMPED PLAN REVISION OK TO COVER |
|
| 06/20/2006 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* AFTER HOURS INSP. -- PAID W/CHECK #745 - CONNECTION TO PUBLIC SEWER OK - 4" SDR TO JUST INSIDE PROPERTY LINE IS OK. - APPROVED PLAN CALLS FOR 6" - 4" MEETS UPC REQUIREMENTS, BUT A PLAN REVISION IS REQUIRED FOR CHANGE OF SIZE. PROVIDE REVISION BEFORE FINAL. - PROVIDE IRON BODY CLEANOUT COVERS IN DRIVEWAY. |
|
| 06/20/2006 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection :* TALK TO BRIAN |
|
| 03/22/2006 | PLUMBING - SEWER HCS CONNECT | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEWER COVERED PRIOR TO INSPECTION EXPOSE ALL PIPING DOWN STREAM OF CLEAN OUTS PRIOR TO NEXT SEWER INSPECTION. CHANGE OF SEWER PIPING SIZE FROM 6" TO 4" REQUIRES A STAMPED PLAN REVISION. |