Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2006 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 01/22/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | RADIUS AREA @ SOUTH CANOPY | |
| 01/19/2006 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) NEED #4 CONTINOUS REBAR AT TOP AND BOTTOM OF TOE DOWN PER DETAIL 102 ON SHEET #4 |
|
| 12/16/2005 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CANOPY COLUMN FOOTINGS TO THE AST QND SOUTH SIDESOF BLDG |
|
| 12/15/2005 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ANCHOR BOLTS NEED TO BE IN PLACE AND SECURE PRIOR TO PLACEMENT OF CONCRETE 2) F4 FOOTINGS AT SOUTH SIDE OF BLDG NEED TO HAVE (2) REBAR MATS (7) #5 EACH WAY TOP AND BOTTOM PER FOOTING SCHEDULE 3) PROVIDE GRADE PINS OR ANOTHER METHOD IN ORDER TO VERIFY/ENSURE FOOTING THICKNESSES |
|
| 12/09/2005 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) BLDG OK DUMPSTER PAD NOT IN |
|
| 12/07/2005 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* |