Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 09/01/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PREVIOUS LIST NEVER INSPECTED 2) REMOVE ALL INSULATION AND MOVE SHEETROCK FOR INSPECTION 3) 20 AMP BREAKER REQUIRED FOR TEMP POWER 4) REFEE WILL APPLY |
|
| 08/31/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PREVIOUS LIST NEVER INSPECTED 2) REMOVE ALL INSULATION AND MOVE SHEETROCK FOR INSPECTION 3) 20 AMP BREAKER REQUIRED FOR TEMP POWER 4) REFEE WILL APPLY |
|
| 08/23/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COMPLETE LATHE 2) REVISE MECH PLAN 3) ANTI-SIPHON 4) FRESH AIR INTAKE WITHIN 10' OF PLUMBING EXHAUST 5) REPLACE BROKEN WINDOWS 6) SEAL VAPOR BARRIER 7) ROOF JACKS 8) DWV OK |
|
| 08/21/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WORK NOT COMPLETE 2) SEAL TPR VALVE PENETRATION 3) SEAL A/C LINE PENETRATION 4) SEAL REAR ELECTRIC BOX AND WEST SIDE SMART BOXES 5) COMPLETE ? GABLE 6) NO PLANS OR INSPECTION CARD ON SITE 7) STOPPED INSPECTION |
|
| 07/27/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CHECK HOLDOWNS AT INTERMEDIATE 2) FRAMING APPROVLA WILL NOT BE GIVEN PRIOR TO INTERMEDIATES |
|
| 07/26/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* |