Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 08/10/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) 2ND RISER FOR 2ND BATH 2ND FLOOR REQUIRED |
|
| 08/04/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLUMB 2ND BATH RISER |
|
| 08/03/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) KITCHEN DRAIN IS ATTACHED TO 2ND FLOOR TRUNK 2) THIS UNIT HAS A BWV |
|
| 08/02/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) KITCHEN SINK ON 2ND FLOOR TRUNK 2) NO H20 TEST 3) PIPE LAYOUT SET BACK |
|
| 08/01/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) RAINED OUT |