Inspection History: EXT METAL CLIPS/EXT SHEATHING

Permit Number - T05CM03060

Inspection Description - EXT METAL CLIPS/EXT SHEATHING

Inspection Status - Approved

Date Description Inspector Results Comments
10/02/2005 EXT METAL CLIPS/EXT SHEATHING Approved IVRS - Inspection :*
09/28/2005 EXT METAL CLIPS/EXT SHEATHING Partial Approval IVRS - Inspection :*
1) TIE FRONT AND REAR 2ND FLOOR TO BEAM PER REVISION
09/22/2005 EXT METAL CLIPS/EXT SHEATHING Partial Approval IVRS - Inspection :*
2) CHANGE OUT HANGER NAILS
3) DETAIL #334 NEED CLARIFICATION SHEAR WALL
ABOVE SETTING ON SINGLE HIP JACK
4) 1ST FLR BEAM OVER WINDOW LIV
5) BELLY BAN DRY WALL NAILING TRANSFER GARAGE
09/15/2005 EXT METAL CLIPS/EXT SHEATHING Partial Approval IVRS - Inspection :*
1) NAIL REAR FRIELE BLKS TO ROOF DECK
2) NAIL SHEAR PANELS ROOF TO DECK 4" O.C. WITH 8DS
3) NEED BELLY BAND DETAIL
09/07/2005 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) SEE LAST INSP
2) TRUSS REPAIR, NAIL 2" OC
3) NEED SHEAR BOXES FLR AT KIT WALL
4) DETAIL 413 HINGE BRACING
5) BEAM TO BEAM HANGOR NEED THA 22
6) ROOF 3 PT BEARING SHIM TRUSSES AT INT BEARING, NO VERTICAL MEMBOR AT 3 PT NEED DETAIL, OK FOR BEARING
7) 1ST FLR GLU LAM 5 1/8 BEARING ON ONE STUD AT WINDOW
8) BELLY BAND DETAIL OMITTED BELLY BAND TIE FLOORS TOGETOR
9) 2 NAILS IN EACH BRACE
10) MISSED WIND BRACE EAST / 1ST FLR
11) 2X NAILER DRYWALL EXT WALL
08/24/2005 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) WRONG HANGERS USE
2) NO TRUSS PLANS
3) BLK. FLR AT STAIRS
4) BEAM BEARING AT LIV. ROOM
5) TRUSSES REVERSED, 3 PT. BEARING ROOF
6) NAIL OFF ALL SHEAR EDGES
7) BEAM BEARING AT SMALL WINDOW LIV. ROOM
8) GAS 3" RISER WAS CUT OFF AND BURIED AFTER SOIL PIPE INSPECTION, 2ND BATHROOM DRAIN
9) SIMPSON HARTOVES? ON PLAN ADVANCED INSTALL
10) SECURE SHEAR BOTTOM TO GLU LAM WHERE IT OCCURS
11) CHECK IF SHEAR 2ND FLR. ON POP OUT, OR BEARING WALL
12) PLAN SIMPSON HUS26 - 32 25 LBS MAX, INSTALLED NU526 MAX 1325 (ADVANCED)