Permit: T05CM03034

Parcel: 125100670


Addresses:

3711 E BROADWAY BL


Inspection Status: Approved

Inspection History: PLUMBING - PROGRESS

Permit Number - T05CM03034

Inspection Description - PLUMBING - PROGRESS

Inspection Status - Approved

Date Description Inspector Results Comments
04/19/2007 PLUMBING - PROGRESS Approved IVRS - Inspection :*
04/17/2007 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*
EACH EQUIPMENT THAT MAY CAUSE CONTAMINATION OF POTABLE WATER SHALL BE SEPARATELY PROTECTED BY THE APPROPRIATE BACKFLOW PREVENTION ASSEMBLY UNLESS EQUIPMENT HAS BEEN LISTED TO MEET UPC STANDARDS
SUPPORT BACKFLOW ASSEMBLIES. PROVIDE CERTS.
TOILET RMS OK. SINKS OK.
04/12/2007 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*
CORRECT VENTING AT WHS
SUPPORT EXP TANK
OK FOR GAS TO KIT. AREA ONLY
CHECK VALVES AT WHS SIZING
04/11/2007 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*
ROOF DRAINS AT TRASH ENCLOSURE W/TEST OK
CLEANOUT PLUGS SHALL BE LISTED TO RECEIVE SCREW IF USED FOR THAT PURPOSE.
03/19/2007 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*
3/4" TYPE K SOFT COPPER W/BRAZED JOINTS
HW & CW TO EXTERIOR MOP SINK LOCATION
USE ADHESIVE TO SEAL JOINTS IN ARMOR FLEX
OK TO COVER AFTER INSULATING
02/01/2007 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*
1) GAS INSPECTED ON UNAPPROVED PLAN DATED 11/01/05. NEED TO SEE APPROVED REV FOR THIS INSTALLATION
01/19/2007 PLUMBING - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
YOUR ABOVE CEILING, GAS AND INTERMEDIATE INSPECTIONS ARE NOT APPROVED. ALSO, PRE-SLAB NOT APPROVED
REMOVE INSULATION FROM CEILING IN ALL AREAS W/PLUMBING
NEW GAS PLAN NOT APPROVED
READ NOTES FROM PREVIOUS INSPECTION.
01/17/2007 PLUMBING - PROGRESS Not ready for Inspection IVRS - Inspection :*
CALL FOR 3035, 3050 AND 3036
ADD A DIRECT CONNECTION FOR DRAIN AT 3-COMP SINK
01/11/2007 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*
1. IF YOU WOULD LIKE INSPECTIONS FOR INTERMEDIATE, ABOVE CEILING, ROOF DRAINS -- CALL FOR THEM!
2. TEST ON RDS OK EXPOSE OR PROVIDE FOAM WRAPS ON RDS PASSING THROUGH CONCRETE.
3. DO NOT COVER ANYTHING ELSE WITHOUT APPROVAL
4. TEST DWV
5. INSTALL HANGERS AT 4'