Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T05CM03034
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/20/2007 | PLUMBING - GAS PRESSURE TEST | Approved | PER PL FINAL | |
04/11/2007 | PLUMBING - GAS PRESSURE TEST | Partial Approval | REVISED PLAN NOT PROVIDED MECHANICAL INSPECTIONS NEEDED SUPPORT GAS SERVICE W/PIPE CLAMP REMOVE CONCRETE FROM PIPE USE NON-SHRINK MASTIC PER CODE. |
|
02/01/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
01/19/2007 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
12/21/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1. YOU DID NOT CALL FOR PRE-SLAB INSPECTION. 2. MOST PIPES HAVE FOAM PROTECTION VISIBLE 3. ANY PIPES THAT DO NOT, WILL HAVE TO BE EXPOSED AND WRAPPED W/FOAM WHERE PASSING THROUGH CONCRETE. 4. MISSION COUPLINGS ARE REQUIRED AT PL TO C1 TRANSITIONS. 5. EXPOSE MISSION COUPLING AT ONE LOCATION BELOW SLAB TO VERIFY. 6. SUPPORT OVERHEAD PLASTIC AT 4' INTERVALS. 7. DRAINAGE FITTINGS ON RD'S 8. TEST OK ON ALL 1ST FLOOR RD'S EXCEPT AT CORRECTION OK. 9. REMOVE EXCESS FLUX W/DAMP RAG PER UPC INSTALLATION STANDARDS. 10. HAMMER ARRESTORS REQUIRED AT QUICK CLOSING VALVES. 11. PROVIDE APPROVED REVISED PLANS FOR GAS AND WATER 12. PROVIDE SPEC FOR GALV 13. CALL FOR INTERMEDIATE INSPECTION WHEN READY |