Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T05CM02798
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/20/2005 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :*ALL CORRECTIONS HAVE BEEN MADE INSULATION OF HOT WATER SYSTEM IS OK OK FOR DRY WALL. |
|
10/15/2005 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*LAVATORY DIRTY ARM MAX SIZE IS 1 1/2" FROM THE BARREL TO THE P-TRAP RE TEST DWV SYSTEM OVERHEAD WATER DISTRIBUTION IS OK R.W.L WATER TEST IS OK OK TO INSULATE HOT WATER |