Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 01/11/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/09/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) METAL BOXES NOT GROUNDED 2) SEAL ALL LATH PENETRATIONS AND MISSING STAPLES AND REPAIR AT T & P LINE, FRONT GABLE NOT LATHED 3) NO TEST ON DWV'S 4) MOVE ELECTRIC WIRES AWAY FROM GUSSETT PLATES 5) PROVIDE ENGINEERING FOR POST TENSION SLAB AT MASTER BATH (JACK HAMMERED) 6) WC IN HALL BATH, DOES NOT HAVE 15" CLEARANCE 7) OVERSPAN AT INT. SHEAR TRANSFER WALL 8) NAIL PROTECT ELECTRIC AT TOP PLATES 9) REMOVE SCREEN FROM DRYER VENT |