Inspection History Details
Inspection Status: Approved
Inspection History: SHEET ROCK NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2007 | SHEET ROCK NAILING | Approved | IVRS - Inspection :* | |
| 02/28/2007 | SHEET ROCK NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL H20 HEATER PRESSURE RELIEF LINE DOWN AND OUT OF EXTERIOR OF CABINET 2) INSTALL ANTI-SIPHON HOSE BIBS 3) POST PERMANENT ADDRESS NUMBERS ON HOUSE 4) CUT SEWER CLEANOUT TO GRADE 5) CAULK AROUND BASE OF TOILETS 6) COMPLETE SHOWER GROUT AND SEAL TO DRAIN 7) RECEPTACLE LEFT SIDE KITCHEN SINK TO BE GFCI PROTECTED 8) INSTALL RECEPTACLE BATH OR BLANK PLATE OFF 9) HAVE MECHANICAL CONTRACTOR MARK HEATER-HEAT STRIP MODEL TO DETERMINE AMPACITY FOR BREAKERS 10) INSTALL BONDING JUMPER ACCROSS NON-METALLIC A/C BELLOW FURNACE ROOM |
|
| 09/01/2006 | SHEET ROCK NAILING | Partial Approval | OK @ EAST ADDITION |