Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2006 | ENGINEERING - FINAL | Approved | ||
| 05/17/2006 | ENGINEERING - FINAL | Denied | DENIED, SITE NOT COMPLETE. 1) INSTALL DG ON SOUTH SIDE OF BLDG PER PLAN. 2) INSTALL GATES ON TRASH ENCLOSURE PER PLAN. 3) SEPARATE CONSTRUCTION ACTIVITY FROM PUBLIC ACCESS. |
|
| 02/16/2006 | ENGINEERING - FINAL | Not ready for Inspection | INSPECTION ACCOMPLISHED PER REQUEST BY ZONING AND ENGINEERING. TOK PICTURES SHOWING SITE WORK THAT IS EXISTING. | |
| 01/26/2006 | ENGINEERING - FINAL | Denied | 1) SITE WORK NOT COMPLETED. 2) ANY AND ALL REVISIONS AND/OR CHANGES TO THE APPROVED PLAN MUST BE APPROVED BY YOUR ENGINEER AND THE CITY OF TUCSON. 3) RIGHT OF WAY IMPROVEMENTS ARE NOT ADDRESSED ON THE APPROVED SITE PLAN ( SITE IS REQ TO HAVE FULL CODE COMPLIANCE). 4) NOTES ON SITE PLAN REQUIRE 8 PARKING SPACES, HOWEVER ONLY 6 SPACES ARE SHOW ON THE PLAN. 5) INSTALL TRUNCATED DOMES AT ALL HC RAMP TRANSITIONS. 6) NO DETAIL SHOWN FOR PEDESTRIAN ACCESS. 7) ROOF DRAINS CAN BE RE-ROUTED TO THE REAR OF THE BLDG. AS LONG AS STORM WATER IS DIRECTED INTO A LANDSCAPE AREA OR EXISTING STORM DRAIN. |