Permit: T05CM02695

Parcel: 12412293A


Addresses:

301 S PARK AV

Inspection Status: Partial Approval

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
02/01/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) BOILER ROOM UNDERGROUND PIPING TEST TO NORTH WALL OF BOILER ROOM TEST OK
11/18/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*REVISED APPROVED PLAN AD-1 REVISION A ON SITE THIS INSPECTION FOR THIS AREA ONLY WASTE & VENT THRU ROOF ROM BUILDING 2 WAY CLEANOUT OUTSIDE SOUTH, PIPE WRAPS & PRIMER LINES OK
ALL WORK IN THIS BUILDING WILL REQUIRE PERMITS AND CITY APPROVED PLANS FOR ALL TRADES, ELECT, PLUMBING, MECHANICAL & BUILDING
10/11/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :* WATER TEST THRU ROOF PER PAGES 1 THRU 3 DATE 10/07/05 MY INITIAL ON SITE TO EXTERIOR 2 WAY CLEAN OUT. PROVIDE CITY APPROVED REVISED PLAN OF ALL WORK WITH VIEWING BY INSPECTOR PRIOR TO COVERING YOUR WORK.
10/06/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1) NEED CITY APPROVED REVISED PLAN WITH WATER AND WASTE AND VENT ISOMETRIC DRAWINGS. THERE IS ADDED FIXTURES AND MUCH MORE WORK THEN WHAT IS SHOWN ON EXISTING PLAN
09/21/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*