Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2005 | PLUMBING - FINAL | Approved | 1-PLBG FINAL IS OK 2-OWNER SHALL PROVIDE A REVISED AND APPROVED DRAWING AS PER RED LINES AS SOON AS POSSIBLE TO OUR OFFICE AS PER DIRECTION OF JESSIE SANDERS (TALKED TO TV ON PHONE) | |
| 09/27/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SHALL PROVIDE A REVISED AND APPROVED PLAN SHOWING RED LINES ON APPROVED SET OF DRAWINGS AND THE ADDITION OF FLOOR SINK AND MOP SINK AND THERE LOCATION PRIOR TO FINAL INSPECTION 2) PROVIDE TEST AND CERTIFICATION OF BACKFLOW PREVENTERS |
|
| 09/18/2005 | PLUMBING - FINAL | Partial Approval | ||
| 09/12/2005 | PLUMBING - FINAL | Not ready for Inspection | 1) ABS DWV THRU ROOF OK 2) COPPER OK 3) OK TO COVER ALL AREAS |