Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 09/15/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WATER TEST UNDERGROUND FROM 2-WAY CLEANOUT THRU BLDG OK 2) WILL NEED TO VIEW PIPE WRAPS PRIOR TO CONCRETE AND CONTINUATION OF 3" SEWER WITH HCS CONNECTION 3) 1/2" HOT LOOPED PER PLAN UNDERGROUND TO KITCHEN SINK 4) 2.1 PLAN REQUIRES 3/4" COLD LOOP TO KITCHEN AND HOSE BIB INSTALL PER PLAN |
|
| 08/31/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/30/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE FULL SIZE UPPER TERMINAL CLEANOUT ON SEWER BRANCH WHICH IS MORE THAN 5' FROM TRUNK SEWER 2) INSTALL PER APPROVED PLAN |