Inspection History Details
Inspection Status: Partial Approval
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2012 | ENGINEERING - FINAL | Partial Approval | ALL PREVIOUS ISSUES HAVE BEEN ADDRESSED. | |
| 04/23/2012 | ENGINEERING - FINAL | Partial Approval | SITE APPEARS TO BE OK, WILL CHECK WITH ELIZABET TO SEE IF SHE HAS APPROVED ALL OF THE OUTSTANDING ITEMS FOR THE ADDITIONAL DRAINAGE. | |
| 04/23/2012 | ENGINEERING - FINAL | Approved | ||
| 04/13/2012 | ENGINEERING - FINAL | Continued | WORKED JOB SITE WITH DAVE. | |
| 04/13/2012 | ENGINEERING - FINAL | Partial Approval | WALKED SITE THIS MORNING WITH RON TO SEE WHAT ISSUES NEED TO BE ADDRESSED PRIOR TO C OF O'S BEING ISSUED. 1) THE DEVELOPER NEEDS TO HAVE ALL OF THE AREA DRAINS SUBMITTED ON AN AS-BUILT DRAWING AND APPROVED BY THE REQUIRED DEPARTMENTS PRIOR TO CALLING IN FOR A FINAL APPROVAL. 2) ENSURE THAT ALL OF THE LANDSCAPING FOR THIS SITE HAS BEEN INSTALLED PER THE APPROVED PLANS. 3) INSTALL ALL HANDRAIL IN THE ADJACENT AREAS AS PREVIOUSLY DISCUSSED DURING FIELD INSPECTIONS. 4) ADJUST TEMPORARY FENCE AS NEEDED THROUGH THE SITE TO PROTECT THE GENERAL PUBLIC FROM ALL AREAS STILL UNDER CONSTRUCTION. THE SITE AT THIS TIME IS READY AT THIS TIME FOR THE PARTIAL RELEASE OF BUILDINGS 1 & 2, THE CLUB HOUSE, AND THE MAIL KIOSK, ALL OTHER BUILDINGS ON THIS SITE WILL BE REQUIRED TO HAVE ADDITIONAL INSPECTIONS ON THEM PRIOR TO ANY RELEASES BEING GRANTED. |