Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T05CM02538
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/28/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*BUILDING INSPECTOR TO RECEIVE (1) BACKFLOW CERTIFICATION FOR CARBONATOR. RECEIVED (1) CARBONATOR + (3) DOUBLE CHECK ASSEMBLY BACKFLOW CERTIFICATIONS. | |
11/25/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
11/23/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*COMPLETE WORK, PROVIDE CORRECT BACKFLOW PROTECTION FOR ALL APPLIANCES WITH DIRECT WATER CONNECTION THTAT REQUIRE PROTECTION | |
11/21/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* ICE MACHINE DRAIN TO BE SEPARATE. ALL GAS APPLIANCES TO BE INSTALLED & HOOKED UP WITH CORRECT GAS FLEX DRAINS AT SODA DISPENSING EQUIPMENT TO BE SEPARATE WEST ICE MACHINE DRAIN TO BE SECURED & TERMINATED PROPERLY DRAIN FROM SODA DISPENSER TO BE RIDGID PIPING SUPPORTED CORRECTLY GRAVITY DRAIN TO RECEPTOR. TRAP PRIMER VALVES TO BE TURNED ON. (2) CARBONATORS REQUIRE (2) REDUCED PRESSURE BACKFLOW DEVICES ( 1) FOUR EACH UNIT. TESTABLE BACKFLOW PROTECTION IS ALSO REQUIRED FOR WATER SUPPLY TO NON CARBONATED BEVERAGES (1) FOR EACH PIECE OF EQUIPMENT. |