Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 09/27/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NAIL PLYWOOD BREAKE AT 8' IN GARAGE SHEAR 2) NAIL PROTECT LAV DRAIN IN MASTER BATH 3) FIRE STOP SOUTH ENTERTAINMENT PARTITION 4) PROTECT PEX LINES ABOVE TRUSS GANG PLATE IN MASTER BATH 5) PROTECT 220 STOVE CONDUCTOR AT TRUSS GANG PLATE ABOVE HALLWAY 6) NAIL PROTECTION OVER PEX LINES IN HALL BATH 7) NAIL PROTECT WIRES THROUGHOUT |