Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2005 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 09/02/2005 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE LAST INSPECTION TWO GIRDER HANGERS CALL IN STUCCO LAST INSP |
|
| 07/22/2005 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* 1) AT INTERMEDIATE CHECK SHIMS STUDS ON TOP OF ENTRY HEADER 2) CHANGE NAILS IN GIRDER HANGER TO 16D'S 3) H2.5'S AT REAR COLUMN |
|
| 07/20/2005 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* 1) STRAPS BETWEEN FLOOR 2) NAIL OFF SHEAR 2ND FRONT/2ND FLOOR |
|
| 07/19/2005 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* 1) SEE LAST INSPECTION |
|
| 07/12/2005 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | IVRS - Inspection :* 1) MISSED DIAPHRAM AT WEST 1ST FLOOR SHEAR WITH P.A. 2) BLK OSB AT ROOF DECK RUN PARALELL 3) NAIL AND WIND BRACE EAST WALL 4) ADD STRAPS BETWEEN FLOORS WEST SIDE AND LAST AT AREA TOP FLOOR IS OFF SET 1 1/8" AT 48" ON CENTER 5) STRAP COLUMNS 6) USE CORRECT NAILS IN ALL HANGERS |