Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 06/30/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) FITTINGS AT LAUNDRY BRANCH, HAVE 3" RUN THRU COMBO TO 2ND FLOOR, REDUCES COMBO TO GTO TO LAUNDRY |
|
| 06/09/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) HOW MANY BATHROOMS FOR 2ND FLOOR 2) ONE 3 DRAIN, ONE 2" DRAIN GOING TO 2ND FLOOR 3) NEED STRING LINES SET FOR PROPERTY LINE 3'-0" SETBACKS AND NEED TO KNOW SET BACK OF EXISTING BLDG LINES EACH SIDE 4) H20 SERVICE LINES NEED TO BE H20 TESTED |