Permit: T05CM02405

Parcel: 13316024M

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
11/17/2005 ENGINEERING - FINAL Approved
11/03/2005 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED.
PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR TO5BU00302 IS COMPLETED AND APPROVED
1. PROVIDE REVISED GRADING AND SITE PLANS FOR MODIFICATIONS TO THE SOLID WASTE TRASH ENCLOSURES.
2. COMPLETE ROCK RIP RAP IN RETENTION/DETENTION BASIN.
3. PROVIDE 42" BARRICADE RAILING AT RETENTION BASIN PERIMETER
4. PROVIDE A CERTIFICATION LETTER FROM AN ARIZONA REGISTERED PROFESSIONAL ENGINEER THAT STATES THAT THE RETENTION/DETENTION BASIN HAS BEEN DESIGNED AND CONSTRUCTED TO THE DESIGN STANDARDS.
5. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
6.PROVIDE TEMPORARY FENCING TO BARRICADE RETENTION/ DETENTION BASIN AND WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PEDESTRIAN ACCESS.
7. PROVIDE PAINTED ARROWS ON PAVEMENT AND ONE WAY SIGNS AT THE (2) EAST SIDE DRIVEWAYS.
11/02/2005 ENGINEERING - FINAL Denied SEE COMMENTS FOR PREVIOUS INSPECTION FOR 10-31-05
PROVIDE TEMPORARY FENCING TO BARRICADE RETENTION/ DETENTION BASIN AND WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PEDESTRIAN ACCESS.
10/31/2005 ENGINEERING - FINAL Denied 1. PROVIDE REVISED GRADING AND SITE PLAN FOR MODIFICATIONS TO THE SOLID WASTE TRASH ENCLOSURES.
2. COMPLETE ROCK RIP RAP IN RETENTION/DETENTION BASIN.
3. PROVIDE MINIMUM 4' SIDEWALK AREA IN FRONT OF BUILDING AT PATIO FENCE. (PROVIDE WHEEL STOPS WHERE NEEDED).
4. PROVIDE 3' VEHICLE OVERHANG AT NORTH PERIMETER RETAINING WALL. SEE DETAIL D, PAGE 7 OF GRADING PLAN.
5. PROVIDE 42" BARRICADE RAILING AT RETENTION BASIN PERIMETER
6. PROVIDE A CERTIFICATION LETTER FROM AN ARIZONA REGISTERED PROFESSIONAL ENGINEER THAT STATES THAT THE RETENTION/DETENTION BASIN HAS BEEN DESIGNED AND CONSTRUCTED TO THE DESIGN STANDARDS.
7. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.