Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T05CM02399
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/28/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1. ALL CORRECTIONS HAVE BEEN MADE 2. OK TO BACKFILL TRENCH |
|
07/26/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SHALL PROVIDE A L SWEEP FOR HORIZONTAL TO HORIZONTAL DRAINAGE AT 2" WASTE 2) SHALL ROUGH IN WASTE FOR FLOOR SINK AND SHOWER IN A CONVENTIONAL METHOD 3) RE-TEST THE SYSTEM |
|
07/21/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE REDLINE ON SITE OF YOUR INSTALLATION 2) PERMANENT CAP ALL ABANDONED PIPING BEFORE COVERING 3) PROVIDE REVISED CITY OF TUCSON APPROVED PLAN IF YOUR GOING TO USE FLOOR DRAINS OF EXISTING PIPING NOT SHOWN ON YOUR APPROVED PLAN 4) INSTALL FLOOR SINK DRAINAGE IN CONCENTRIC MANNER. THERE IS NO SITE CONDITION THAT REQUIRES HORIZONTAL VENTING |