Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/20/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SANITARY VENTS ON ROOF TO BE TERMINATED CORRECTLY AND PAINTED. IF WITHIN 10' OF AIR INTAKES TO BE 2' ABOVE 2) PROVIDE 3-GALV SCREWS AT EACH JOINT OF WATER HEATER VENT 3) PROVIDE 1" AIR GAP FOR ICE BIN DRAIN 4) PROVIDE ACCESS TO AIR ADDMITTANCE VALUE AT SINK IN WAITRESS STATION 5) SECURE WATER HEATER EXPANSION TANK |
|
| 10/19/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*LEFT GAS CLEARANCE CARD AT METER CONTRACTOR TO INSTALL SIGN: ANSUL VALVE ABOVE( EITHER ON CEILING TILE OR ON STAINLESS STEEL HOOD. |
|
| 10/11/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |