Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 01/09/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WATER TEST UNDERGROUND THRU BLDG TO 2-WAY CLEANOUT OK 2) NEED TO VIEW PIPE WRAPS PRIOR TO CONCRETE AND HCS CONNECTION |
|
| 01/03/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE COMPLETE DWV SYSTEM, 10 ONE TYPE OF MATERIAL 2. PROVIDE LONG RADIUS DRAINAGE FITTINGS WHERE REQUIRED. 3. HAVE TEST IN PLACE AT TIME OF INSPECTION 4. PROVIDE RED LINE OF YOUR INSTALLATION AT TIME OF REINSPECTION 5. HAVE PIPING SHADED WITH GOOD MATERIAL. |